Implementation

UrbanSentinel is in early implementation. Working prototypes have been tested at BUET, BCSIR and the BEXIMCO effluent treatment plant; the next step is a 12-month pilot on the Turag river and at three factory treatment plants, alongside work on coastal Pond Sand Filters.

Front one

Industry: textile effluent plants

Around Dhaka, 719 textile washing, dyeing and finishing factories discharge into the rivers. Factories that follow the ZDHC guidelines test their wastewater twice a year, but discharges are episodic, so infrequent samples rarely catch them, and without a fast result treatment plants dose every batch for the worst case and waste energy.

At a factory, an UrbanSentinel unit sits at the outfall of the existing effluent treatment plant as a polishing and disinfection stage. It treats each batch only as far as the standard requires and logs the result, which gives the factory a continuous compliance record between its twice-yearly tests and gives regulators evidence of what left the plant and when.

How it pays for itself

Factories supplying international brands already pay for wastewater testing. Revenue comes from compliance monitoring sold as a service and from municipal purchases, and certified e-waste handlers supply the parts.

Feasibility visit at an industrial treatment plant. At the BEXIMCO effluent treatment plant with World Bank Bangladesh officials and BUET professors, assessing where an UrbanSentinel unit would sit in a working treatment train.
Inside a textile factory. Textile industry visit, reviewing how a factory monitors its production and wastewater.

The Phase 1 estimate, in cubic metres

Konabari's 33 washing, dyeing and finishing units sit upstream of the monitored stretch of the Turag. If continuous monitoring and tracing cut their untreated discharge by 10–30%, the pilot keeps 0.6–1.8 million m³ of untreated effluent a year out of the river.

Phase 1 estimate: Konabari textile cluster on the Turag

Million cubic metres a year. Modelled: each assumption below will be replaced by a pilot measurement.

  • Water and effluent
  • Untreated discharge
  • Kept out of the river
02468101214Water used by 33 units13.0Leaves as effluent (80%)10.4Enters the river untreated (58%)6.0Kept out with a 10% cut0.6Kept out with a 30% cut1.8
Show the data as a table
StepMillion m³ a year
Water used by 33 units13.0
Leaves as effluent (80%)10.4
Enters the river untreated (58%)6.0
Kept out with a 10% cut0.6
Kept out with a 30% cut1.8

How the estimate is built

13.0 million m³ used × 80% = 10.4 million m³ effluent
10.4 × 58% untreated = 6.0 million m³
6.0 × a 10–30% cut = 0.6–1.8 million m³ kept out

Assumptions the pilot will measure

  • 80% of the water used leaves as effluent
  • The national untreated share (203 of 349 million m³, 2021 projections) holds in Konabari
  • The 20 river units cover the outfalls of all 33 units
  • Monitoring and tracing cut untreated discharge by 10–30%

Modelled Sources: IFC via The Daily Star (2017); BUET study via The Daily Star (2019); Apparel Insider.

The portable plasma purifier. A complete treatment unit that fits in one hand: a small solar panel charges recovered lithium cells, and a flyback transformer from a scrapped CRT television drives the plasma electrode. No grid connection and no chemicals.
Rapid test at a pond edge. Field test of the rapid-detection unit: the optical head is dipped into pond water and the display returns estimated BOD, COD and coliform values with a safe, risky or danger score.

Front two

Communities: Pond Sand Filters and floods

On Bangladesh's saline coast, ponds are often the only fresh water, and Pond Sand Filters are how communities make them drinkable. Sand removes turbidity, but microbes get through: filtered water has carried 7–10 faecal coliforms per 100 mL, 4 of 13 filters surveyed were out of service, and the filters did not remove Vibrio cholerae in any of 16 cases tested.

Through a WaterAid Bangladesh Youth Fellowship, UrbanSentinel's plasma stage is being adapted as an add-on that tests and disinfects Pond Sand Filter water before it is drunk, so that existing filters can be upgraded rather than replaced. In development

Flood response

Floods contaminate water and cut the power at the same time. A portable solar unit disinfects in seconds without chemicals or grid electricity. An earlier portable unit served about 170 families in Feni during the August 2024 floods, which affected 5.6 million people in eastern Bangladesh.

Sources: Ferdausi and Bolkland (WEDC), pond sand filter performance; Shishir et al. (2018), Vibrio cholerae in coastal water supplies; UNICEF (2024).

Roadmap

From characterised prototypes to a city-wide network, then to a second country.

  1. Now

    Before the pilot

    • AI-selected plasma settings characterised
    • Sensing models cross-validated
    • PFAS test repeated with controls
  2. 0–12 months

    Phase 1 pilot

    • 20 monitoring units on the Turag below the Gazipur–Konabari textile cluster
    • 3 units at factory effluent treatment plants
    • 500 laboratory-paired samples with a held-out test set
  3. 12–30 months

    Phase 2: city scale

    • A Dhaka-wide network of units
    • Source tracing live for regulators
    • Water intakes warned 2–6 hours ahead
  4. From 30 months

    Phase 3: transfer

    • A second country
    • Open model and data schema
    • A peer-reviewed paper on the integrated system

Partner on the Phase 1 pilot

Current partners: BUET's Institute of Appropriate Technology and water quality laboratory, the BEXIMCO effluent treatment plant and the WaterAid Bangladesh Youth Fellowship. Phase 1 seeks a garment manufacturer and the Department of Environment.